Warning
Incomplete work instructions.
CSW-71D-CM Compressor Packaging¶
K. Packing (Quality Control Check # 3)¶
Once the Quality Control Check # 2 have been completed you can begin the packaging process.
Panels Clean / Paint Matches¶
This unit has several panels that close the unit.
Front Panel¶
The front panel is fit over the front of the unit making sure the pressure gauge fits neatly into the cutout and is fastened into place using the screws called out in the BOM.
Right Panel¶
Left Panel¶
Back Panel and Plate¶
Top Panel¶
Aeroquips Clean¶
CP / F-70 / HC-10 Handles Installed¶
Product Labels Applied¶
CryoSRV Logos Applied¶
Units W/O Casters On Foam Pads¶
All Panel Screws Installed¶
Caps and Plugs Installed¶
Tip & Tell Installed¶
Repair Labels Applied¶
K-2. PACKING INSTRUCTIONS¶
Preparation¶
Utilize a forklift to safely bring the unit down to the floor. If the unit is equipped with wheels, check if they are rolling properly.
Crate Assembly¶
Prepare each crate with a wooden base measuring (22x19.5x¼) inch and lined with 3 inch foam across both sides.
CSW-71D-CM Unit Placement¶
Carefully place the compressor inside the crate using the forklift.
Finishing Touches¶
Add 1 inch foam in front of the unit to ensure the crate door can close securely. Clearly mark the crate with the work order and compressor model number. Attach the CM test paperwork to the crate.